Thursday, September 8, 2011

New C Ring Traverse Rod Hardware



We are so excited about our new traverse system with C rings!  It has significant improvements over traditional C ring systems.  The system is offered in cord draw or baton draw in Brown or White track and all components are ball bearing. 

Finestra can assemble and paint your traverse systems in one of our 36 custom hand finishes.  Or, you can purchase components individually and assemble and paint your own system. 

Easy to Install


1.  After installing the bracket securely to the wall, attach the wood fascia to bracket using one screw per bracket. Short screws are provided. The wood fascia is decorative and holds no weight.


2.  Traverse track will be held in place with the support notch or “tooth” at the end of the bracket (Figure 1) and the camlock on the bracket that locks the track in place (Figure 2). When the track is in place inside the tooth of the bracket, turn the camlock with a flat head screwdriver to hold the track into place (Figure 2,3).


3.  Attach the C Rings to the carriers and master carriers. Place the C rings with the prong facing downward in the square hole of the carriers. These are the top holes in the carriers. Position the rings up over the wood fascia with the prong facing the top hole in the carrier. For ease of installation, tilt the rings to the side at an angle and push into the square hole to lock into place.  This will lock the ring into place and will not move or sag back down to the pole.
______________________________________________

Easy to Order
Checklist
1.  Length of Pole/Track
2.  Fluted or Smooth
3.  Center, Left or Right Draw
4.  Cord Left or Right
5.  Length of cord drop (Standard is 72")
6.  3" or 6" return brackets
7.  Brown or White Track/Cord/Tension pulley

_____________________________________________

If you have any questions about our new C ring traverse system, feel free to give us a call!
1-888-443-8182

No comments:

Post a Comment